Operations Management Board

Europe/Amsterdam
Description

──────────────────────────────────────────

Please join my meeting from your computer, tablet or smartphone. 
https://global.gotomeeting.com/join/842788485 

You can also dial in using your phone.
Netherlands: +31 207 941 377 

Access Code: 842-788-485 

More phone numbers
Austria: +43 7 2081 5427 
Belgium: +32 28 93 7018 
Canada: +1 (647) 497-9391 
Denmark: +45 32 72 03 82 
Finland: +358 923 17 0568 
France: +33 170 950 594 
Germany: +49 692 5736 7317 
Ireland: +353 16 572 651 
Italy: +39 0 247 92 13 01 
Norway: +47 21 93 37 51 
Spain: +34 932 75 2004 
Sweden: +46 853 527 827 
Switzerland: +41 435 5015 61 
United Kingdom: +44 330 221 0088 

New to GoToMeeting? Get the app now and be ready when your first meeting starts: https://global.gotomeeting.com/install/842788485 


──────────────────────────────────────────

Participants:
Matthew
Alessandro Paolini
Catalin Condurache
David Cohen (NGI_IL)
Gianfranco Sciacca (NGI_CH)
Ionut Vasile (NGI_RO)
Jan Astalos (NGI_SK)
Valeria Ardizzone
Vincenzo Spinoso 
Greg Corbet
Jerome Pansanel
Emir Imamagic
Baptiste Grenier
Linda Cornwall
Sven Gabriel
Stephane Gerard (BeGRID)

=================
Introduction
Matthew Viljoen
=================
- UMD: preparing a new release for CentOS8 products
- SL6 will be retired at the end of the year

- interactions with WLCG by participating to GDB
- EGI Conference 2020 23-25 June in Lyon
- EOSC-hub week 2020 18-20 May in Karlsruhe


===================
FedCloud badge system
Valeria Ardizzone, Vincenzo Spinoso
========================

presenting the prototype status

question: the site that lost the badge, was it a problem of the site or elsewhere?

the problem was with Caso accounting, the site fixed it and republished the data

in general, we should not penalize the sites for causes external to them

Vincenzo: allowing a sort of re-computation if there are valid reasons, after an assessment by OMB

the badge system will become a regular topic at OMB meeting, where particular cases can be discussed and analysed

===========================
Security updates
Sven Gabriel (NIKHEF)
==============================

- EGI-OSG coordination

- one incident: virtualisation demon exposed
- at least 2 servers remotely compromised
- user credentials revoked

- storage elements ACL issues

there is a check if ACLs are open enough

- Licensing
which copyright rules do we put to our advisories and materials?

the AMBER advisories cannot be shared
when labeled TLP White, they can 

modifying the wiki pages adding the TLP reference would help

- F2F meeting report

asking the new EGI press officer to collaborate for the Outreach projects
meeting this afternoon to discuss this

- CSIRT is heavily using RT, replacing it with another tool would require a lot of coding work


===========================
CREAM-CE replacement survey
Catalin Condurache (EGI.eu)
==================================

========================================
change in the EGI Default OLA and EGI Core Services OLAs¶
Alessandro Paolini (EGI.eu)
=====================================

EGI Default OLA: https://documents.egi.eu/document/2752
EGI Services OLA/UA template: https://documents.egi.eu/document/2278


there were no particular remarks, changes are approved

======================================
updating PROC06, PROC07, PROC08¶
===================================

https://wiki.egi.eu/wiki/PROC06 (Setting Nagios test status to operations)
- the operations tests are managed on Poem (ARGO_MON_OPERATORS) by ARGO team, no more through the operations dashboard

https://wiki.egi.eu/wiki/PROC07 (Adding new probes to ARGO)
- there is a testing instance of ARGO suitable to test the integration of either new probes or simply new version of existing probes, before the deployment in production

https://wiki.egi.eu/wiki/PROC08 (Management of the EGI OPS Availability and Reliability Profile)
- it is no more necessary creating a duplicate A/R report to test changes: the tests that are moved to the critical profile have been already tested a lot when moved to the OPERATORS profile, and usually we move one test per time.


waiting for the end of the month before approving the changes 

There are minutes attached to this event. Show them.