3rd OLA Task Force meeting

Europe/Amsterdam
EVO (Universe)

EVO

Universe

Description
3rd OLA Task Force meeting
EVO details
Presentation at March 15th OMB
Resource Centre OLA v1.1
Review dialogue form
Slides
3rd OLA Task Force meeting (05 Apr 2011)

Attendance
  1. Renato Santana
  2. Miroslav Dobrucky
  3. Andres Aeschlimann
  4. Torsten Antoni
  5. Malgorzata Krakowian
  6. Christos Kanellopoulos
  7. Tomasz Szepieniec
  8. Phone bridge: Michaela until Vera joined
  9. Vera Hasper
  10. Peter Sologna
  11. Moldova NGI
  12. Mats Nylen
  13. Tiziana Ferrari
  14. Dimitris Zilaskos


Tiziana: putting replies for the comments in the review of the OLA at https://rt.egi.eu/rt/Ticket/Display.html?id=1526

The is now terminology section explaining what is RC, RIP, Capability, NGI.The NGI definition is
a European concept and it is not generallay applicable outside Europe. The OLA mut be flexible enough for non European partnerships.


Renato: For example in Latin America there 2 ROCs in the same area, ROC_LA and
ROC_IGALC where a partner represents a cluster of institutes

Tiziana: Comments still being incoporated in version 1.1. Document with track changes and comments with explainations is attached to the material.

Dimitris: with regards to a RIP OLA, what should be contained? A RIP has to provide
  1. Nagios: This is mandatory
  2. Helpdesk: This is mandatory
  3. ROD: This is mandatory

Tiziana: Core services: Not all NGIs have for example a top level bdii, which was mandatory in EGEE
Tiziana: When the cental monitoring system at CERN works fully we will be able to define thresholds. So the quality parameters for the RIP obligations will come afterwards.

Proposed structure for the RIP OLA document
  1. Introduction
  2. RIP madatory services
  3. GOCDB interactions (data that RIP is required to maintain and ensure they remain accurate)  
  4. Certify RCs on time, adhere to the egi certification procedure. enforce policies. Possible also expclity mention which policies to adhere, and same for procedures.

AP: Dimitris circulate the draft document first in the task force for comments, by the end of the week

Thomasz: think about resposibilities of the RIP first, and scope of the RIP OLA.

Goal: By the end of May-mid June have a consolidated draft that can be exposed in the review.
There are minutes attached to this event. Show them.
    • Resource Centre OLA

      Recap on the latest RC-RIP OLA version and comments on https://rt.egi.eu/rt/Ticket/Display.html?id=1526

    • Resource Infrastructure Provider OLA Contents

      Discussion about the content of a future RIP OLA. For example it could take part of the current RC OLA, and also some material from https://wiki.egi.eu/wiki/NGI_International_Task_Review_MS109_Denmark